Quantcast
Channel: SCN : All Content - Governance, Risk and Compliance (SAP GRC)
Viewing all articles
Browse latest Browse all 5097

GRC 10 Synchronization Jobs not pulling in all roles

$
0
0

Hi All,

We currently have GRC 10 installed and configured (ARM only) but we have noticed that after running all Synchronization jobs that not all of the roles are being imported into the system and that different landscapes are missing different roles( i.e. shows up in Production Connectors but not in DEV Connectors). To add to this all jobs show successfully completed and there are no errors or warnings in SLG1

 

They seem to mostly be related to Derived roles with the error "Role does not exist" and Composite roles "Child role does not exist.

 

While I have verified that the reference role is uploaded first and some of the derived from that reference do synchronize and are imported, not all derived roles show in the list( i.e. reference role a is selectable and derived role b is imported and selectable, derived role c states "Role does not exist". As for the Composite roles, the child roles are present but still receives the error. I have verified all authorizations are correct and have run both full and incremental synchs.

 

Its worth mentioning also that in the error logs for the import it always returns with 997 roles selected no matter the enviroment or number of roles in the enviroment.

 

If anyone could help it would be GREATLY Appreciated!

Thanks,

James


Viewing all articles
Browse latest Browse all 5097

Latest Images

Trending Articles



Latest Images