GRC 5.3 SP9 CUP configured initial with backed ECC Qa system . Now I want to configured CUP with backed ECC Dev system
While doing the CUP configuration of GRC 5.3 unable to find the
connectors system name in the below mentioned tab
CUP Configuration --> Role --> Attributes --> Application Area -->
System
As per the post installation steps (AC53_CG_Final_en_Dec_2010 ) done
all
changes and system restated till the system not showing in the
selection, and unable to find the old assigned systems also in the
system tab.
Regards,
Naveen