Hi gurus,
I am working with an Internal Control Framework that has the following structure:
Process 1-Subprocess 1-Control X
Process 2-Subprocess 2- Control X
Subprocesses 1 and 2 are linked to the same Organization. My question is...is it possible to test Control X once and the results be shared in the Subprocess?
I have read the functionality of Referenced Control but i don´t know if this really applies to it.
Any input would be much appreciated.
Thanks a lot,
Kind regards