Hello, SAP experts,
I have an issue while configuring SSM-GRC integration. Both SSM and GRC have version 10.0.
We have successfully installed and configured our SSM environment, also installed GRC and followed all required SSM-GRC configuration steps as provided in the SSM administration manuals.
After that we have made some initial configurations in GRC like setting Org Structure, Objectives, Activities, Risks etc and set-up SSM scheduler to import all GRC data into SSM via SSM administration web portal.
The problem is that GRC Scorecard KPIs section of SSM administration / Connectors tab is still empty and no GRC data is provided inside SSM system. In SSM administration / Connectors / GRC Scorecard KPIs we can select the PAS model then the org dimension (which is filled with data) but after selecting the org dimension no GRC related data is displayed.
I have a suspicion that our GRC system might be incompletely configured for the SSM-GRC integration. If this is the case what are the basic GRC configuration requirements for the SSM-GRC integration to work?
Thank you for help and support.
Best regards,
Donatas